EVERESTScaffolding Services
Project overview

Thomas Telford UTC

Independent scaffolding, edge protection and loading bay towers for solar panel installation on steeply sloped metal-clad roofs.

Client
Kembla Ltd
Sector
Education / Solar
Thomas Telford UTC

The Challenge

  • Fixed six-week school holiday window with strict programme constraints
  • Metal-clad façade limiting traditional fixing methods for edge protection
  • Steep, deep-angled roof slopes requiring bespoke edge protection design
  • Coordinating loading bay towers for material handling without compromising safety

What We Did

  • Developed a bespoke scaffolding solution tailored to the building's complex geometry
  • Engineered edge protection specifically for steep metal-clad roofs with continuous fall protection
  • Careful sequencing of scaffold erection to enable early access for the solar installation team
  • Strategically placed loading bay towers to optimise material delivery and reduce manual handling

“Everest Scaffolding Services Ltd consistently deliver on even the most challenging schedules. Their planning expertise and attention to detail ensured that scaffolding, edge protection, and loading bay towers were delivered safely and on time. Their ability to manage a complex, programme-critical project was outstanding. We will definitely be using Everest Scaffolding Services Ltd again on future projects. They are a trusted and reliable partner.”

Client testimonialThomas Telford UTC
Free quote

Need a scaffold like this?

Tell us about the job and we will come back with a clear, free quote. Residential, commercial or industrial, no job is too small or too big.

Call usFree quote