Jct 6 Industrial Estate Warehouse Units

Jct 6 Industrial Estate Warehouse Units

Jct 6 Industrial Estate Warehouse Units

CLIENT

Hitchens Contractors

CLIENT

Hitchens Contractors

PROJECT OVERVIEW
PROJECT OVERVIEW

Safe access and perimeter protection for roof repair and maintenance works as part of a full refurbishment at the JCT 6 Industrial Estate.

Safe access and perimeter protection for roof repair and maintenance works as part of a full refurbishment at the JCT 6 Industrial Estate.

The Challenge
The Challenge

Designing a safe and practical access staircase that allowed multiple trades to access the roof efficiently Installing roof perimeter edge protection on an industrial building with complex roof layouts Minimising disruption to ongoing refurbishment activities Maintaining high safety standards throughout erection, use, and dismantle

Designing a safe and practical access staircase that allowed multiple trades to access the roof efficiently Installing roof perimeter edge protection on an industrial building with complex roof layouts Minimising disruption to ongoing refurbishment activities Maintaining high safety standards throughout erection, use, and dismantle

WHAT WE DID
WHAT WE DID

Provided a secure access staircase, enabling trades to reach all areas of the roof safely Installed robust edge protection around the roof perimeter to protect workers during refurbishment and maintenance Close coordination with Hitchens Contractors to align scaffold erection and dismantle with the refurbishment schedule Comprehensive risk assessments and method statements (RAMS) prepared for all works Inspections and monitoring throughout the project to ensure continued compliance with health and safety legislation

Provided a secure access staircase, enabling trades to reach all areas of the roof safely Installed robust edge protection around the roof perimeter to protect workers during refurbishment and maintenance Close coordination with Hitchens Contractors to align scaffold erection and dismantle with the refurbishment schedule Comprehensive risk assessments and method statements (RAMS) prepared for all works Inspections and monitoring throughout the project to ensure continued compliance with health and safety legislation

Hitchens Contractors

Hitchens Contractors

Founder

"Everest Scaffolding Services Ltd provided an excellent scaffolding solution for our roof refurbishment works. The ringlock system and access staircase were installed safely and efficiently, allowing our teams to work confidently and effectively at height. Their planning, professionalism, and attention to safety were outstanding throughout the project."

"Everest Scaffolding Services Ltd provided an excellent scaffolding solution for our roof refurbishment works. The ringlock system and access staircase were installed safely and efficiently, allowing our teams to work confidently and effectively at height. Their planning, professionalism, and attention to safety were outstanding throughout the project."

Everest Scaffolding

Professional scaffolding solutions

across the UK. Safety, reliability, and

excellence in every project.

Our Address

Beacon Park Farm,
Bridle Lane,
Barr Beacon,
WS9 0RG

Everest Scaffolding

Professional scaffolding solutions

across the UK. Safety, reliability, and

excellence in every project.

Our Address

Beacon Park Farm,
Bridle Lane,
Barr Beacon,
WS9 0RG

Everest Scaffolding

Professional scaffolding solutions

across the UK. Safety, reliability, and

excellence in every project.

Our Address

Beacon Park Farm,
Bridle Lane,
Barr Beacon,
WS9 0RG